Finally, all of the electrical installation and air-con work done. Well at least this part I had no task to complete. All electrical work was carried out by Chris, the licensed electrician from Beachside Electrical.

It was over a year ago when Chris arrived and ran the wires from my main switch box to the outside point on my house. Then, once I had the plans of the concrete slab location was determined, he dug the trench and run the wires near where the slab was going to be poured.

At later stage, he came and ran all the wires inside the frames of the studio construction.

So, Chris has been there since before the start of the build!

Also completed are the sanding of plasterboard putty to a smooth finish. So much dust, so very little video section on this.