Now that the external wall frame and plywood panels are up, next is to wrap the building with weatherproof wrap, to keep it from getting damaged from the elements until cladding and roof is installed.

Once the wrapping is done, next getting the roof beams installed. These are heavy, as they are 140mm x 45mm by 4.2 meters long, and there are 11 of them to install. I’ve used twice as many metal brackets to mount them, just to be safe.

Soon the roof will go on and the internal frames bolted down.